Ask Inspector Bob - ARCHIVED Q&A
OK...here's a log of Questions and Answers and
Discussions posted prior to the website being redesigned. There's a ton of
information that you may find helpful.
I'm sorry Ron...I'm not an architect or a DSA
plan checker. Just a regular DSA inspector. The AOR or SEOR submit the mounting
details and calculations. We follow the approved plans.
Name: rod cardin
Date:
25 Jun 2015
Time: 11:51:50
QuestionorComment
proper way to mount smart boards
In a nut-shell...if an RFI, ASI, ASK, SK or
SSK details changes to the approved structural, fire/life-safety, or access
drawings, a CCD must be issued allowing DSA to review and approve the changes.
As the Project Inspector I typically review changes that come across the table.
If I feel the change should be submitted as a CCD and reviewed by DSA I will
speak to the CM, AOR and SEOR. There are times when a change meets the intent of
the original approved plans, in which case I will ask for an engineer stamped
detail which I will file and show to the DSA field engineer when he visits.
This may not be a popular approach, but
it's kept me out of trouble and I believe it is what DSA expects.
Name: inspector joe
Date:
24 Jun 2015
Time: 06:01:59
QuestionorComment
Thanks Bob for this tool what and why demands that an RFI become a CCD thanks
Although certification was separate for OSHPD
and DSA, they used to be joined at the hips. They are now completely separate
entities, but they use the same basic code models and reference standards. They
each administer their own examinations and issue separate certifications. You
can carry both certifications. There are sections of the code that apply
strictly to hospitals. Critical systems such as medical gas and emergency
power/life support are elements that differentiate school work from hospital
work. Pay scale is about the same, although some larger hospital projects may
pay more.
PS...this isn't just about the money. You
are going to need more than masonry and concrete background to get onto large
scale projects (where the money is). At union scale or prevailing wage, you
might be making more money as a masonry or concrete inspector than you would
starting out as a lower classification DSA or OSHPD inspector.
Name: [email protected]
Date: 16 Jun 2015
Time: 18:01:47
QuestionorComment
Hi
I have been inspecting since late September of 2014 I know I need 3 more years
to take a DSA test What is the difference between obtaining a DSA licence vs a
OShPOD IOR I have ACI Masonry and Concrete but I wanna do more and earn more
money
Everything you need to know is in the
Qualifications Matrix sheets provided by DSA at:
http://www.documents.dgs.ca.gov/dsa/inspect/2015_InspectorPackage.pdf
Remember...passing the test does not mean you
are automatically approved to inspect on a DSA project. Approval is case by
case/project to project.
Name: L James
Date: 02
Jun 2015
Time: 07:23:16
QuestionorComment
Hello Bob I am an electrician of twenty years and I am interested in becoming a
DSA inspector I have read the experience requirements and it looks like i
qualify for the class three and four test Is there any other requirements beside
my tradesman experience that will prevent me from qualifying for the test
George...I know this sounds rude, but if you
don't know how or where to submit information to become a DSA inspector, you
will not be able to pass the test anyway. Also, there's tons of contact
information in this website...just look in reference and resource pages.
Name: George Schirm
Date: 22
May 2015
Time: 11:08:00
QuestionorComment
where can you get the form to take the test for obtaining an inspectors license
See Feb 17th and 18th Posts below. Ongoing
discussion...
Name: Inspector Ralph
Date: 18 May 2015
Time: 21:34:58
QuestionorComment
dir
registration I got the same response that said we must register but dont fall
under prevailing wage If you look on the dir sight for this issue go to faq the
fourth question is about dsa and the answer is as long as we are under
prevailing requirements we must register After I saw that I emailed the dir told
them they cant have it both ways they need to decide to put us under prevailing
wage guidelines or leave us alone I have emailed 3x last two months no answer
http://www.aonfpe.com/
AON
707 Wilshire Blvd., Suite 2600
Los Angeles, CA 90017
Phone: 213.630.2020
This is not a recommendation. This is one company
I have experience with.
Name: Attorney
Date:
15 May 2015
Time: 15:03:29
QuestionorComment
Hi
Bob I am an attorney working on a case and am looking to retain a fire alarm
expert preferably DSA approved to testify regarding practice and procedure
industry standards etc for a project in Ventura County Are you able to recommend
anyone Thank you
The term "water heater" can mean
many things. Are we talking about a boiler type system or a household type water
heater? Currently, most states (except California and some others) require ASME
certification for units rated for 200,00 BTUs and higher and/or storage
capacities of 120 gallons or greater. A licensed mechanical engineer should be
making the determination.
Name: Ohbradley
Date:
01 Apr 2015
Time: 08:04:23
QuestionorComment
Are
ASME water heaters required on a new college building inspected by DSA
One of the reasons I like trying
to answer these questions is that it forces me to review the code books. I just
went through sections 6, 7 and 8 of the National Fire Alarm Code. It seems to me
that a voice notification system is used to notify occupants of the need to
relocate within a facility rather than simple evacuation, which occurs when
visible and audible alarms are triggered during an event. This would most likely
be a decision made by the design engineer and the jurisdiction authority
reviewing the type and design/occupancy of a building. Some buildings may have
"safe" areas or a combination of "safe" areas and specific evacuation routes. In
any case, the voice notification must be followed by audible alarms used in
conjunction with visible notification devices and appears to be a design
consideration. I doubt if it would apply to purely administrative areas since it
seems to be a mthod of directing the public or employees to areas of safety.
Name: Inspector Pete
Date:
26 Mar 2015
Time: 16:00:57
QuestionorComment
when are fire alarms in schools required to include voice notification and are
they required in purely administrative areas
Assuming you are doing structural
work (?), see CBC 1916A.2 Tests of Reinforcing Bars. It states that with
identified rebar and mill certs on file, do 1 bend and 1 tensile for each 10
tons for each size of bar. No mention of grade. (PS...I'm still using 2007
code).
Name: Inspector Ben
Date:
12 Mar 2015
Time: 15:31:48
QuestionorComment
If
the plans specify grade 40 rebar does it need to be tested or are mill Certs
sufficient
Rick...thanks but my perspective
is as a DSA approved inspector. I inspect to DSA approved contract documents.
What school personnel decide to do on their own is outside my scope of
expertise. I can tell you; they are dealing with a potential Life Safety issue
and had better consult applicable codes related to exhausting heat producing
equipment. You do not let heat finds it's way to a hole in the roof or opening
in the wall. You install a double wall duct/vent designed to exhaust the
heat/fumes and protect students from injury.
Name: rick
Date: 10 Mar
2015
Time: 16:41:36
QuestionorComment
One
of our Community Colleges has an interest in using a portable kiln fueled by
propane Initial idea was to use the kiln outdoors in a patio area Now it looks
like they want to use it in a steel storage building with no dedicated hood but
the storage unit has openings at the top The college is thinking this is
adequate ventilation your comments thanks Rick
All field welding requires either periodic or continuous inspection by a
certified CWI working for an LEA approved testing lab. All welds must be
detailed so the inspector can show compliance with the approved plans. AWS
welding codes indicate minimum requirements. The design may require more
restrictive requirements. Are there CJP splice welds at the stringers? If
so....continuous inspection and NDT. Single pass fillet welds? Periodic
inspection after intial startup inspection. Don't forget about material
identification, mill certs, approved welding procedures, welder certifications.
Get details from design team
for all welds. Call for shop material ID and CWI welding inspection. Call for
field CWI welding inspection. We just demo'd a massive stair system that had no
inspection and was not constructed per the approved plans. Students will
be using these stairs. Their lives are in your hands. Contact your approved
testing lab and get a CWI to watch the welding AFTER details are provided.
Name: JoeStairs
Date:
10 Mar 2015
Time: 14:51:54
QuestionorComment
In
California what type of special inspection is required for steel stairs we are
using single stringer and double stringers stairs with weld on precast concrete
treads that are welded in the field what however they are not in the structural
plans
Name: Inspector Dave
Date:
09 Mar 2015
Time: 18:16:51
QuestionorComment
I emailed the DIR last week and today they got back to me I have
some follow up questions for them and will be talking on the phone with them
hopefully tomorrow but for now here is what they emailed me on the subject
The duties of the DSA Inspectors falls within the definition of Contractor
according to 1722 1 As such the DIR is requiring DSA Inspectors to register
There is no prevailing wage for DSA Inspectors and DSA Inspectors will not
be required to file prevailing wage reports
What height wall? Is wall part of
a fire-rated assembly? Is HC access impacted? Are materials and installation
methods in compliance with applicable codes/standards? Too many questions to
give you an answer. The last thing you want is for a section of wall to fall and
impede access in a fire or emergency. Rated assemblies that provide student
protection should not be altered without review.
Name: Rick
Date: 03 Mar
2015
Time: 17:19:09
QuestionorComment
Can
students be in charge of building walls in a community college This would be a
minor remodel project
Name: chaz
Date: 19 Feb 2015
Time: 13:47:13
QuestionorComment
what is the billing rate for a dsa class 1 and 2 inspectors in the orange county
area
Name: SB 854 Trainer
Date:
18 Feb 2015
Time: 16:20:17
QuestionorComment
DIR
Determination with all punctuation removed Generally the work performed by DSA
inspectors falls outside of the scope of prevailing wage determinations If this
is the case the DSA inspector would not need to register However if the DSA
Inspectors perform any actual inspections or tests then the Building
Construction Inspector Fields Soils Materials Tester determination rates would
apply and therefore the DSA inspector would need to register
Name: getitrite
Date: 17 Feb
2015
Time: 01:11:47
QuestionorComment
what limits the AOR from dictating Means and Methods to the IOR as in percentage
of time spent in the field and who and when to send off dailys and IR to be
signed and returned to GC everyday just a few items here that AORs have been
sticking their noses into
Name: get it rite
Date: 17
Feb 2015
Time: 01:07:02
QuestionorComment
DIR
situation is SB854 requiring DIR to fee charge and regulate all qualifying
CONTRACTORS and SUBCONTRACTORS whom wish to bid on PW projects We are not
CONTRACTORS nor are we SUBCONTRACTORS as defined in the State Statues CONSULTING
FIRMS DO NOT CONTRACT TO THE GC OR THE PM so why are we registering with the DIR
Per the California SS the Law CONTRACTOR is referenced as the California State
Licensed Contractor nothing else
Are you kidding me? Thanks for
the heads up...! L.A. City sent out similar letters a few times over the past
years. Most special inspectors ignored the letters.
Name:
Inspector joe
Date: 12 Feb 2015
Time: 02:00:41
QuestionorComment
Bob I think you are confusing what the last two
questions have been about The dir is asking for contractor registration and the
big firms are in forcing the three hundred not three fifteen on their inspectors
This issue is on the first page of the the dir public works website
Check out Jan 5th post below. I
always recommend that you get a full set of plans from a multi story building,
study every page and don't turn the page until you understand everything on it.
Understand single line diagrams and piping riser diagrams. Get all the code
books and standards that you can and read them. You don't have to memorize, just
know where to look for answers about administrative duties, certification,
responsibilities, structural, architectural, and MEP typical code applications.
Download the recent IR manual from DSA and read the IRs. Study ADA access and
Fire Life Safety. Study and understand all the new DSA regulations for
documentation. #1, make sure you have field experience and understand all the
systems and processes and what your responsibilities are.
Some people are NOT good test
takers...don't get bogged down on one question. Answer what you can and then go
back to the difficult ones that you couldn't answer. Go to your car after the
test and write down as many questions as you can remember in case you need to
re-take the exam.
Name:
Alex
Date: 06 Feb 2015
Time: 10:49:20
QuestionorComment
Bob
I have recently submitted my application for a DSA class 1 inspectors license I
reside in Ventura CA and I am looking for a live course in the area to prepare
me for the test I would appreciate your feedback
Added Response: After Joe's
comment on the 12th (above); I realize you're talking about something completely
different...something I didn't realize was happening. So it is NOT the WC $,
this is inspectors being forced into registering as a contractor!? Is this a
union influenced thing to push independents out?
If you are subcontracting your
services to an inspection firm, you are essentially an employer. I assume the
money you are paying is for Workman's Compensation. The inspection firm
wants you to pay in to show evidence that you are not an employee of their
company. That's the bottom line. Here's two lines from the DIR web site:
Q. Do I need to have
workers' compensation insurance?
A.
Yes, California law requires employers to have workers'
compensation insurance if they have even one employee. If you
are a roofer and don’t have any employees, you are still
required to carry workers’ compensation
insurance.
Q. My spouse and I
are the sole owners of our business. We have no employees. Are
we required to obtain workers' compensation coverage?
A.
Generally, coverage for sole owners is
optional. You would, however, need to have workers' compensation
coverage for any employee you may hire, even if it’s just one
employee, and even if it’s just temporary employment. You should
consult with your attorney, insurance agent or broker, or
carrier regarding the specifics of your situation and your
options.
Name: Inspector rob
Date:
06 Feb 2015
Time: 01:08:10
QuestionorComment
I
work for one of the big inspection firms in southern California I just received
an email stating that I have to pay the dir three hundred dollars for mandatory
contractor registration Half of the inspectors have just paid the fee based on
the email sent out by the inspection firm What I dont understand is if the dir
doesnt recognize us or classify us as inspectors why are we paying them for
anything
Fixtures must be positively
(mechanically) attached to grid runners. The clips can pop off in an earthquake.
See IR 25-2.01
1.10
Attach all light
fixtures and ceiling mounted air terminals, to the ceiling grid runners to
resist a horizontal force equal to the weight of the fixtures. Screws or
approved fasteners are required.
Name: ElectE1
Date: 04
Feb 2015
Time: 13:02:00
QuestionorComment
Are
earthquake clips considered approved fasteners for attaching light fixtures to
ceiling grid runners per DSA
Name: get it rite
Date: 23
Jan 2015
Time: 23:37:01
QuestionorComment
WHAT UP no kidding RE pipe protection 313 dot 9 in the 2010 not in the 2013 you
mite look at 312 dot 9 NOW if you could just get my PEOR to do the same That
would be the quest
Name: What Up
Date: 21 Jan
2015
Time: 10:08:15
QuestionorComment
Get
it right Pipe Protection Steel plates Code313 9 still there
Name: get it rite
Date: 20
Jan 2015
Time: 19:33:49
QuestionorComment
Safety Plates for In Wall Piping as in Protection NO LONGER EXIST well well I
missed that one or did I get smoked over by the PEOR
Name: What up
Date: 19 Jan
2015
Time: 10:35:26
QuestionorComment
Inspector Jim That would have been my question paying attention to detail and
submitials is key as it relates to a good inspector I mean being a detail
orientated person Get it right you may not want to bring too much attention to
this as people will point the finger to you Sound like that could get messy
Name: get it rite
Date: 15
Jan 2015
Time: 16:13:39
QuestionorComment
oddly enough the ER0329 report dated in 1 1 2014 has it as 4 and a half while
the ER0329 date 9 1 2014 has at 3 and 7 8th inch flute Cant be pointing the
finger at the SI or the CWI the sub seems clueless and by all terms the 12 inch
cc is there The 3 inch height is there everything else is there even the 2
different dated ERs are identical except the width of the flutes dang deal
Name: Inspector Jim
Date: 15
Jan 2015
Time: 13:18:14
QuestionorComment
Get
it right where was the Inspector who is supposed to check all materials
delivered to the jobsite
Name: GET IT RITE
Date: 13
Jan 2015
Time: 20:49:08
QuestionorComment
We
have a new boogus material supplier ASC metal decking with a 3and78 flute should
be 4and12 inch bottom flute Now What LW concrete is down and nobody catches this
fubar SEOR geTs to redo all the calcs YUP
I can make any personal
recommendation, but you can check out
http://www.inspectoracademy.com
Name: inspection wizz
Date: 05 Jan 2015
Time: 19:03:30
QuestionorComment
looking to take the dsa inspectors exam and looking for timed practice test
available on line any help
Each district has slightly
(sometimes major) differences in how they contract inspectors. Typically you
will need to get on a district's RFQ (Request for Quote) or RFP (Request for
Proposal) email contact list. Larger districts send out detailed requests for
specific information. Your "template" will look different district to district.
I create a binder (sometimes 6 may be requested) with separate indexed sections
addressing each key-point in their RFP/RFQ. Sound complicated? I've had to
submit 70 page binders to get listed as an approved inspection firm within a
particular district.
Bare-bones minimum: Name,
address, resume, qualifications, certifications, experience and references.
Name: inspector newbie
Date: 09 Dec 2014
Time: 17:28:51
QuestionorComment
is
there someplace that I could get my hands on a template for a typical contract
for DSA inspections services I am going after a job on my own for the first time
This web site is for DSA inspection
of schools (California). All welding inspection must be done by an employee of
the approved Lab of Record, approved for each specific project.The school
district typically contracts the services of an LEA approved testing lab that
dispatches inspectors to the site. LEA approved labs are listed on DSA website.
Name: MetalMan
Date:
08 Dec 2014
Time: 08:15:48
QuestionorComment
Is
there an approved list of inspectors for the metal fabrication and welding
portion of a job or is it simply having an organization that is capable of
inspecting to the various fabrication and welding codes outlined in the
requirements
You can submit a complaint about a
DSA inspector to the DSA area field engineer, the Project Manager, the
architect...If the inspector is upholding the plans, spec and code, you'll have
a tough time with your complaint.
Name: rick
john
Date: 13 Nov 2014
Time: 10:18:07
QuestionorComment
How do you file a complaint against dsa inspector
Sorry...I missed
this one. If you're pouring concrete with rebar you must provide a method of
consolidation as outlined in ACI 318, 5.9 and 5.10. This is referenced in Title
24, 1905A.9 and 1905A.10 in the 2007 code I'm currently using. You'll need to
check ACI 318 for any exclusions. Roadwork is flatwork and we used expensive
rolling vibrating screeds on my last project.
Name: Contractor Tim
Date:
28 Oct 2014
Time: 18:52:07
QuestionorComment
Is
there any prevailing code or testing agency that requires ALL concrete to be
vibrated I am specifically inquiring about flatwork poured at 6 inches thick
DSA does not pre-approve. The
coupler must have an ICC evaluation report (ES) showing testing and acceptance
for the application you will be using (e.g. #4 vertical bar splice in a flexural
member). Dayton makes many approved couplers (Dayton Bar Grip). Your SEOR must
review and approved for the application.
Name: walt
Date: 27 Oct 2014
Time: 16:48:59
QuestionorComment
looking for DSA pre approved rebar coupler
Anytime a larger piece of high
strength steel is cut into smaller sections, the testing lab technician or CWI
must witness the transfer of the heat number to each piece. So, inspector
identifies incoming high strength materials at shop for your project. A couple
days later the shop wants to cut into smaller shear plates or knife plates. A
lab person must witness the cutting and transfer of heat number to verify that
the smaller sections actually came from the originally identified piece.
Name: John
Date: 26 Oct 2014
Time: 20:53:13
QuestionorComment
Is a deputy
inspector required to witness transfer of heat numbers to all pieces prior to
being cut even after the material has been identified and marked
Your DSA Field Engineer will make
that call. As the IOR you may have to bring it up with the field engineer. The
decision will be his. It is not made clear in IR A-8 so I am speaking from my
own personal experience. The owner must also be consulted since they pay the
bill. They may be inclined to say "no" so it's good to have your DSA Field
Engineer put it on his FTN that an assistant is warranted. There is a project
valuation that DSA uses as a guideline for assistant IOR but I don't know where
they get that number. Anybody else?
Name:
Architect #3
Date: 24 Sep 2014
Time: 13:31:31
QuestionorComment
Is there a DSA or Admin Code mandated project size
threshold where a 2nd IOR will be required full or part time on a jobsite
My DSA T&I sheet calls for periodic
special inspection. DSA recognizes a certified CWI as a welding inspector on
school projects. I would want a CWI but my answer is only an interpretation of
how to meet DSA guidelines. It's welding... and a welding inspector must have a
CWI cert. Shear stud welding is covered in AWSD1.1.
Name: inspector gadget
Date: 04 Sep 2014
Time: 14:22:40
QuestionorComment
Is
an ICC building inspector allowed to perform nelson stud inspections
See ASTM C 635. Main runners carry
the weight/loads of the ceiling system and suspended items. C 635 says "splines"
shall not be used for structural support for the ceiling material. Spline
means connector or joining strip. In any case, the manufacturer would have to
have a splice detail and the detail should be reviewed and approved by the
engineer for your project...I have no idea what kind of loads you are supporting
or where the splice is in relationship to your hanger wires.
Name: Inspector Joe
Date:
27 Aug 2014
Time: 15:32:26
QuestionorComment
During a Modernization we added a wall and the contractor cut back the T bar
ceiling main runners to install the wall my question is are they allowed to
splice the main runners or do they need to replace the entire main runner the
splice is roughly 4 inch from the end
DSA IR 19-1 (free download from DSA)
covers post installed anchors, including epoxy applications. When frequency of
testing is not indicated in approved contract documents you must assume that all
epoxy bars will be tested. I've always tested 100% of epoxy rebar dowels with
test values specified in writing by the engineer. Test values will depend on
product data and specific application and must be calculated and approved by the
engineer. Engineer must submit epoxy dowel locations, embedment, size of bars,
type of epoxy and testing requirements to DSA for approval if not shown on the
stamped approved drawings.
Epoxy-type (adhesive) anchors
shall be tension tested per Section 1923A.3.5. The tension test load shall equal
twice the allowable load for the specific location of the anchor to be tested
(i.e., accounting for edge distance) or 80% of the yield strength of the bolt
(0.8AbFy),
whichever is less. The test procedures for expansion-type anchors in the
attached table shall also be used for epoxy-type (adhesive) anchors. Torque
testing of epoxy-type (adhesive) anchors is not permitted.
Where epoxy-type (adhesive)
anchors are used as shear dowels across cold joints in slabs on grade and the
slab is not part of the structural system, testing of those dowels is not
required.
Name:
pro-pain
Date: 29 Jul 2014
Time: 11:43:15
QuestionorComment
what is the requirement for frequency of testing
epoxy embedded rebar and where is that section
Waterproofing at the elevator pit
should be clearly indicated on the contract drawings or in the contract
specifications. Depending of type of elevator system, ground water table, soil
type, etc. Waterproofing may include a membrane at bottom of pit placed prior to
pour, bituthene membrane applied with or without protection board on exterior of
concrete at pit walls and/or rolled or brushed on waterproofing applied at
inside of pit walls. The cementious product brushed on at the interior walls can
peel or bubble if not applied correctly.
Name: Inspector Dave
Date: 22
Jul 2014
Time: 11:17:31
QuestionorComment
Can anyone steer me in a direction that might
clarify any requirements for waterproofing an elevator pit prior to concrete
placement
Article 110 Title 24 Part 3
and National Electric Code call for all conductors and equipment to be certified
and labeled by a Nationally Recognized Testing Lab. UL is the recognized
standard.
Name: Inspector Lee
Date: 18 Jul
2014
Time: 17:24:48
QuestionorComment
Does DSA require that all electrical being installed
in schools have UL Certification If yes can you point me to where I can find the
information
Name: Inspector
Dave
Date: 26 Jun 2014
Time: 12:15:15
QuestionorComment
Thanks Joe This is my understanding as well however
in these days where we practically need to have a law degree just to read the
codes I wanted other opinions I am happy now back to work
Name: inspector joe
Date: 24 Jun
2014
Time: 16:29:33
QuestionorComment
insp dave are you referring to the 2007 req to
increase the horizontal dimension of a footing by 1 inch at each vertical
surface per section 1805A 4 2 6 If that is the case this requirement has been
repealed and is no longer required the language has been removed from the 2010
code version section 1808A 8 5
I'm still working out of
2007 code. Note is in 1805A.4.2.6. Anyone else?
Name:
Inspector Dave
Date: 24 Jun 2014
Time: 13:24:56
QuestionorComment
Bob My question has to do with the old requirement
that footing trenches be over excavated where directly in contact with concrete
I no longer see this called out and I wonder if I am overlooking something
Section 1808A 8 5 only says concrete is permitted to be cast against the earth
where in the opinion of the building official soil conditions do not require
formwork
7.3 ACI 318 covers bending of rebar but leaves field bending of rebar up to the
engineer. Babaei and Hawkins wrote a good article called "Field Bending and
Straightening of Reinforcing Steel". To sum it up, you can field bend bars up to
No. 11's. You need to apply heat to bars No. 6 and larger. For bars No. 5 and
smaller you do not need to apply heat to bend a straight bar. You do need to
apply heat to No. 5 bars and smaller if they were previously bent.
The quote above is an old but the
restrictions on field bending of bars is usually specified in the contract
documents/specifications. When cold bending, such as with a #4 bar, whether you
do it in the shop or in the field, it comes down to approval by the engineer and
having the right equipment to perform a proper radius bend. The final concerns
are; are the the bars are embedded in concrete or have they previously been
bent? ACI 7.3 leaves field bending to the structural engineer.
Name: PE Bob
Date: 18 Jun 2014
Time: 16:25:04
QuestionorComment
Is it ok to field bend no 4 rebar on site
MC Cable is listed as an approved
wiring component in the electrical code. It's restrictions are typically noted
in the contract specs for your project, as directed by the design team. These
restrictions have to do with not being able to pull new wiring or add wiring in
the MC-Cable. There are times (e.g. security wiring at a door frame) where it is
the only thing that will work. It may be allowed by your electrical engineer at
specific locations where access issues prevail. I have used it on several
projects with the electrical engineer's written permission. Hope that
helps...remember, I'm not a DSA code person; I'm just an inspector.
Name: PE Bob
Date: 18 Jun 2014
Time: 12:20:26
QuestionorComment
Is it acceptable to use MC Cable within a kitchen of
a school
I just spoke with DSA engineer. He
said that permanent shoring systems (e.g. tie-backs) must have design, testing
and detailing submitted for review and approval AND will require a monitoring
system.
Name: inspector joe
Date: 17
Jun 2014
Time: 12:50:49
QuestionorComment
Per appx j sec j106 2 the rqmt of this sec shall
apply to temp and perm earth ret shoring when dsa facs are affected shoring used
as constrn means and mthds only and does not affect DSA facs are not regulated
by DSA or and shall satisfy the rqmt of the AHJ per sec j106 2 6 the shoring
design eng shall make periodic insp and observation of the shoring system per
j106 2 6 2 T and I observation shall be in accordance with T and I observation
rqmts approved by the bldg official I hope this helps
I have had the same experience and
the DSA field engineer only required a stamped geotechnical review and approval
of the shoring plan. I'd like to hear what anyone else has to say on this. I
don't remember submitting shoring plans being submitted to DSA but this was for
temporary shoring. If it's going to remain in place you should consult with your
architect and your DSA field engineer. It may require submittal and approval.
Name: inspector
Date: 17 Jun
2014
Time: 08:26:13
QuestionorComment
working on a school project that requires a
engineered temporary shoring system to support a vertical cut of 19 feet The
shoring will remain in place after the construction of a retaining wall The
shoring plan requires special inspection and testing for concrete steel and PT
Also requires continuous geotechnical observation This work is not part of the
approved plans and specifications Should the plan be submitted to DSA for review
and approval
This has become a matter of
contention on my jobs as well. I believe you are correct in saying the 30 minute
rule has disappeared. It puts the final responsibility on the contractor or,
when a pour schedule is reviewed by the engineer, on the design team.
Name: Zenith
Date: 11 Jun 2014
Time: 12:21:47
QuestionorComment
What are the limitations and actual prescribed time
allowed for cold joints in vertical wall form pours This info not in ACI docs
just refers to plasticity of concrete What happened to the 30 minute rule for a
cold joint
Attachments of items suspended
overhead must be per an approved detail provided by the AOR/SEOR. Mounting may
also require bracing. e.g. ceiling projectors; modern ceiling projectors are
lightweight but still require approved support and bracing. Once an anchor or
brace is installed, the owner could remove suspended object and replace with
heavier object. Anchorage/support/bracing should be submitted to DSA.
Name: inspectorK
Date:
11 Jun 2014
Time: 11:25:17
QuestionorComment
we
are in need of providing DSA submission for mounting items under 20 lbs ie
speakers cameras etc where can we find the approved mounting hardware DSA
Inspector advised on some current speaker installations we did not use an
approved lag bolt
Start of construction is not based
on Form 156 alone. Construction Start Notice/Inspection Card Request Form 102-IC
must be submitted by AOR and SEOR. Project (each building) must have a Form 152
Project Inspection Card issued by DSA. IOR must issue Form 151 Project Inspector
Notifications. Construction cannot start without the DSA Project Inspection
Cards.
Name: bassthecat
Date:
09 Jun 2014
Time: 13:13:41
QuestionorComment
The
contractor on my job has not been notifying me of the start of construction on
some of the buildings on my Campus He did give me a sheaf of DSA 156 forms
filled out all filled out and dated in February stating that this fulfilled the
48 hour minimum notice Can I issue a deviation notice when work takes place
without notice being given
IR A-8 Project Inspector -
is responsible for ensuring that all code-prescribed inspections and
administrative duties are completed, including supervision of assistant
inspectors and monitoring of special inspectors. The Class 1 project inspector
may utilize one or more assistant inspector(s) to assist in performing
inspection and administrative duties on a project.
The project inspector must
perform specific duties in accordance with Title 24, Part 1 (Sections 4-333 and
4-342). The project inspector acts under the direction of the Design
Professional in General Responsible Charge and is subject to supervision by DSA.
The project inspector does not have the authority, under Title 24, to direct the
contractor in the execution of the work, nor to stop the work of construction.
Basically, you're current
arrangement is opposite of that stated above. However, I like to review RFI's
before they are submitted to help determine if they are actually needed.
I also like to be kept in the loop on all construction matters. I don't think
DSA would disagree. Just remember, we are responsible to the design
professionals and DSA. The ultimate decision on all construction matters must
come from them, not us. We cannot direct the construction activities or
provide solutions to problems.
When I see an issue with an RFI,
I contact the AOR and/or engineer to discuss it and they make the decision.
Sometimes contractors try to avoid approved details and use RFIs to make changes
that aren't needed. I'll contact the C.M. and the AOR to give my viewpoint but
the ultimate decision is with them. If it represents a change to an approved
structural detail I demand a CCD be submitted to DSA. Often, this request will
stop an unnecessary RFI. I also review pay apps 1st, since I am in the field. I
review submittals to make any comments to the architect. For instance, I noticed
a submittal had a change to the complete penetration weld shown on the approved
plans (went from open root to a closed root with no notes on back-gouging). I
sent an email to AOR and contractor is re-submitting to provide detail that
matches plans). The AOR missed this detail change.
Name: bassthecat
Date: 07 Jun 2014
Time: 19:09:22
QuestionorComment
In the District I work for the protocol is that all
communication with the design professionals is through the IOR That goes for
RFIs as well Do you know if this protocol is stated in any of the DSA
publications or presentations
Questions that I normally address
are related to field inspections. This is an internal DSA policy question. I'm
sorry I can't help answer your question.
Name: Jeffery
Date: 05 Jun 2014
Time: 20:09:16
QuestionorComment
Is DSA approval required for mobile kitchens
There used to be...not sure
anymore. I always recommend self-study, studying all code books and standards to
the point where you at least know where to look for answers to code questions.
Even on the job I cannot memorize ever code section, but I know where to look
quickly.
I also recommend getting a
full set of plans from a project and do not turn the page until you understand
everything on the current page....structural, architectural, mechanical,
electrical, fire sprinklers, elevators...you must know how to read plans and you
can do it on your own if you apply yourself. Good luck!
Name: jj henry
Date: 05 Jun 2014
Time: 13:18:45
QuestionorComment
i am going to take the DSA 1 test in Sept 2014 my
question is do you know any person or outfit that provides preparation classes
specifically designed to help me pass the 2 part exam
NFPA 13 addresses fire sprinklers in
concealed spaces in combustible construction where pitched roof is wood joist or
wood truss construction. Otherwise all detailing shown has sprinklers at
ceiling. I have no idea what your rating or design is. To find out more for your
particular construction, look through NFPA 13 and consult with your design
architect. All sprinkler heads should be shown on the approved plans prior to
construction.
Name: Builder dan
Date: 22 May
2014
Time: 09:30:36
QuestionorComment
If I have a concealed space above a Sheetrock
ceiling in a wood frame structure filled with insulation does this space need to
be fire sprinkled This is also a college dorm
Name: Inspector George L
Date:
20 May 2014
Time: 18:37:31
QuestionorComment
This is a response to Duane below We were just
talking about that move in labs the other day Give me a call Nathan has my
number if you dont
Jimmy, your question is a planning
department question. This site is for Project Inspectors that follow approved
plans and specs already drafted and approved by DSA.
Name: Wireless Jimmy
Date: 31
Mar 2014
Time: 12:20:54
QuestionorComment
Hello Bob Im proposing a new Wireless Telecommunication Facility Cell Site at a
Community College and was wondering if you could please direct me to the
resource ordinance regarding setbacks height limitations estimated approval
times etc for Cell Sites
You're probably referring to special
inspection. This site is for DSA Project Inspection. Sorry I can't help you on
this one.
Name: duane
lorenz
Date: 12 Mar 2014
Time: 11:22:26
QuestionorComment
since when is prevailing wage not paid for school
work at approved fab shops
Thanks! "slightly loose" is what
I consider as slack. I didn't know there was actual reference to this wordage.
Name: just sayin
Date: 04 Mar
2014
Time: 11:07:30
QuestionorComment
Hey Bob I asked a question a couple weeks ago about
slack wires at light fixtures in t bar ceilings Just ran across something in the
Code Code does not use the term slack wires See 1615pt10pt13 ASCE 7 section
13pt5pt6pt2pt2pt5 Fixture support wires may be slightly loose to allow the
fixture to seat in the grid system Same wording in the A code 1615Apt1pt12
Form 292 no longer gets submitted
to DSA. It is submitted to testing lab engineer. Lab engineer issues a 291
stating that all testing was completed in accordance with DSA approved
construction documents.
Name: Mike
Date: 26 Feb 2014
Time: 10:27:48
QuestionorComment
This is in regards to a school project and closeout
For Post Installed Anchors which form does it go on The DSA 291 or DSA 292
Name: B A Cyborg
Date: 22
Feb 2014
Time: 13:11:15
QuestionorComment
a copy of the letter I sent and the email address
for the Dept of Industrial Relations is on the web at the Linked In group DSA
INSPECTORS and can be cut and pasted by anyone if it helps
Name:
B A Cyborg
Date: 22 Feb 2014
Time: 13:07:02
QuestionorComment
Anyone who does not like low DSA wages due to the
misuse of the consultant status needs to send a letter to the DIR before March
Since our DSA form 5 says we must put in 40 hour weeks we are not able to get
other simultaneous work like every other independent consultant WE HAVE SPECIAL
CIRCUMSTANCES
It is my understanding that Form 156
is submitted for each milestone indicated on the inspection card(s). Typically
there will be a card for site work and a separate card for structure. My site
work card does not mention demo but I would say it depends on the scope of the
demo. For instance if large pipe is to be removed, it should be verified by
inspection. Demo would be a milestone whether shown on the card or not because
it will eventually relate to mass grading and compaction.
Name:
bassthecat
Date: 20 Feb 2014
Time: 10:40:26
QuestionorComment
When does the Contractor need to submit their Form
156 to the Project Inspector As he begins demo or when new work on an inspection
card block begins
The Fire Sprinkler Company will
be a licensed approved installer of fire sprinkler pipe and fittings. They will
submit plans stamped by their engineer. The smoke detectors are detailed,
engineered and installed by a fire detection/alarm company and there is
coordination between this company and the mechanical engineer regarding fire
smoke dampers and alarms. This means there are 3 separate engineers and sets of
drawings involved. Finally, all these plans and details must be submitted to DSA,
reviewed and approved by Fire Life Safety division; assuming we're talking about
school construction.
All these plans go thru the
AOR, SEOR, and district for review for cost impact, supports to structure and
overall coordination plans.
Name: Martin
K
Date: 19 Feb 2014
Time: 12:34:38
QuestionorComment
To ASM101 ref who is responsible for the location of
smoke detectors fire dampers etc Our firm usually obtains plans from the Fire
Sprinkler Company hired as either contractor consultant or both They create the
overall FSS or FA plan The only requirement is that the plans be overstamped by
the design professional in general responsibility of the project The ME and SE
can review the plan for constructability calculations notes and general code
compliance but this is not a requirement
Name:
michaelc
Date: 19 Feb 2014
Time: 05:54:34
QuestionorComment
i was looking for dsa masonry exam study guide
Contact manufacturer.
Name:
Inspector Shirley
Date: 04 Feb 2014
Time: 14:21:28
QuestionorComment
can districts paint their switchgear been asked this
question before but deferred to another inspector who has said it will void the
ul rating but unable to find definitive answer please help thanks
I do not have documentation but
slack is not "loose". The further the fixture drops the more sway arc
it will have. The idea is to provide secondary support AND to prevent the
fixture from pounding the ceiling framing apart as it swings during an
earthquake. This may be a personal call....use your best judgement and only
accept work that meets your interpretation of code intent.
Name: Just sayin
Date: 30 Jan
2014
Time: 09:32:57
QuestionorComment
OK checked DSA IR 25 2 10 it just says at fixtures
less than 56 pounds you need two number 12 slack wires at diagonal corners Does
anyone have any documentation regarding definition of slack wire or how far a
fixture could be allowed to fall before being caught by the slack wire Thanks
very much and keep up the good work
Name: Just sayin
Date: 29 Jan 2014
Time: 22:21:54
QuestionorComment
Bob So Im having a little discussion with the
electrician regarding what an installed slack wire should look like at a light
fixture in a t bar ceiling In my opinion the light should only be able to drop a
few inches In his opinion as long as the light cant hit anyone in the head when
it drops its ok ie it could dr several feet and be ok Whats your opinion and do
you have any backup Just realized I should have checked the DSA IR manual before
I wrote this
I don't believe that DSA limits
seismic straps to any particular manufacturer. It is up to the engineer to
provide a design criteria and/or detailing. The contractor then submits the
product that they feel meets the design criteria for engineer review and
approval.
ISAT is an organization that
engineers designs for seismic bracing that are OSHPD OPA approved and accepted
by DSA when the ISAT detailing is provided on the approved plans.
I don't know the capacity of
your water heater. Diameter, height, weight, anchorage- these will all be
factors that require review. I don't know of any specific manufacturers. The
architect and consultant will know.
Name: Mark
Date: 23 Jan 2014
Time: 14:32:44
QuestionorComment
Bob Do you know where I can find a the list of DSA
Approved Manufacturers that make water heater straps I tried the DSA website
with no luck I see various website that mention that a brochure is available
All FLS detailing and locations must
be shown on the approved plans. Have consultant (through Architect) submit a CCD
showing all FSD locations and get DSA review and approval. We are not field
engineers and the contractor is not a code compliance plan checker. We
(inspectors) follow approved DSA documents and related codes and standards.
Name: ASM101
Date: 22 Jan 2014
Time: 14:37:35
QuestionorComment
Dan we are being told that the engineer does not
need to locate the FSD or fire dampers on the drawings because of a general note
that states put FSD or fire dampers in where required
Testing lab and IOR should maintain
copy of all shop fabrication daily reports, material ID, mill certs, and NDT
reports. All special inspectors contracting directly and individually with the
school board must submit a Form DSA 292. The testing lab engineering manager
must submit a 291 report.
To avoid any confusion, I ask
the testing lab of record to provide a Form 292 for all shop and field
structural steel and high strength bolting inspectors (one form for each
discipline). Form DSA 292 states that the form must be submitted by the Special
Inspector within 14 days of the conclusion of work requiring special inspection.
or when work is stopped for more than one month, or if the services of the
Special Inspector have been terminated for any reason.
Name:
Inspector Rob of LAUSD
Date: 17 Jan 2014
Time: 14:35:15
QuestionorComment
Welding of structural frame of shade shelters are
done in shop fabrication Per California Admin Code the welding
Inspector should turn-in a DSA form 292 Special Inspection Verified Report
DSA is also asking for Shop Fabrication report Do they mean a 291 Lab
report from the shop
Name: Just sayin
Date: 17 Jan 2014
Time: 10:25:03
QuestionorComment
Hey Nailer I am a DSA 1 and OSHPD A I thought the
level of difficulty was basically the same for both exams I have heard other
people say that they thought the DSA exam was tougher Its been awhile since I
took the exams so maybe things have changed This may irritate some folks on here
but I think DSA aims pretty low Passing score on DSA exam is 60 percent while
OSHPD passing score is 75 percent
Mechanical engineer stamps
drawings submitted to DSA for FSD locations. DSA FLS reviews and approves
design. The inspector follows the approved plans or DSA approved modifications
if changes are made.
Name: ASM101
Date: 16 Jan 2014
Time: 11:58:21
QuestionorComment
Dan I have a question that hopefully you can answer
for us in the state of California Who is responsible for showing the locations
of fire dampers and fire smoke dampers on the mechanical drawings
Can a design team architect or engineer state provide any and all dampers where
required whether shown or not Is it up to the mechanical contractor
installation contractor to determine how the code should be interpreted Thanks
Yes. Be mindful of med gas requirements for copper piping and fittings which
requires sealed and protected fittings to avoid any contamination.
Name: nailer
Date: 14 Jan 2014
Time: 12:12:35
QuestionorComment
current oshpd inspector thinking bout taking my dsa
exam are there similarities between oshpd and dsa
Name: Just a
spoke in the wheel
Date: 09 Jan 2014
Time: 10:00:52
QuestionorComment
Batman its only a one hour wall relax take a bat
pill
Name: Just sayin
Date: 09 Jan 2014
Time: 09:51:00
QuestionorComment
Getitrite As long as the rated wall is not part of a
rated exit enclosure get the owner of the unistrut to contact hilti or some
other fire caulking manufacturer and have them provide an engineering judgement
for the condition on your job Have the EJ submitted to AOR for approval and you
are done